3 Experts Tips from Someone With Experience

Effective Re-Roofing Methods

Being able to learn and understand effective roofing in today’s roofing technology is knowing all about the technology behind the newly-developed and advanced roofing materials and the specific kind of applications that must be used in installing these materials. There are important considerations to be made by a homeowner, once he/she decides to let his/her home undergo roof replacement and these considerations are calculating the cost estimates of this project, making research on a most effective and less costly roof material to use, surveying which contractor is more knowledgeable and has enough competent experience on re-roofing to back him up, and knowing what pitfalls to watch during the roofing replacement process.

Property protection should be the first thing that a professional contractor should undertake, using tarpaulins and plywood to cover the areas of the house and its properties from being damaged while the old roof materials are being stripped off and replacement procedure is taking place. When the residential property has been well-protected with plywood or tarps, the removal of the old roof shingles begins until all of them have been completely taken out, while another team works out in inspecting the wood decking if they are still in good condition.

Thorough inspection of the wood decking must be conducted, before installing the new roof shingles, so that any found rotted wood can be replaced with a new solid one as wood decking serves as the foundation structure for the roof shingles to lodge on. Roof inspectors must be careful to thoroughly check the roof parts, which includes for missing nails, so as not to result into bumps formation on the roofs which is due to not nailing back the old wood decking during the installation of the new shingles.

The roof specialist makes it a point that after a thorough roof inspection, replacement of wood decking, the entire roof surface must first be installed with protective materials, such as a 90 degree piece of metal called drip edge, which is mounted around the roof edges to prevent any rain from coming into the the roof materials that are found at the edges; ice and water shields, which are roofing underlayment, are fixed at the roof bottom and at all areas where rain can penetrate; roof felts which should be mounted all over the roof so as not to allow the shingles to stick to the wood.

The last phase in roof replacement is the installation of the new roofing materials, working from the bottom to the upper part which will followed by a series of connecting procedures, such as counter flashing, ridge vents and capping. As homeowner, one must insist on the contract for a cleanup job and a post roofing inspection be done after the re-roofing process, so that you get the full satisfaction of being assured of a thorough roof job done for your home.

Getting Down To Basics with Roofers

Getting Down To Basics with Roofers